Ceiling Calculator
Tiles, main runners, cross tees and wall angle for a suspended grid.
Calculate Materials
The tile the grid is built around. Halving it doubles the tile count and adds a second set of cross tees.
Extra to order for cuts at the perimeter. 10% is typical.
Results:
Nothing to work out yet
Enter values for Length, Width.
How it Works
Main runners hang every 1200 mm across the room and are ordered as 3.6 m lengths. Cross tees frame each 1200 × 600 cell between them, and a 600 × 600 grid needs a second set of 600 mm tees to split those cells again — a grid cannot be built from tiles and runners alone. Tile count is the ceiling area divided by the module you choose. Wall angle follows the room perimeter in 3 m lengths, and your waste factor is applied to every item. Hanger wire is counted last and is the part most often left off: the runners carry the grid but something has to carry the runners, so a drop is allowed every 1200 mm along each main, which works out at about one per 1.44 m² of ceiling.
A worked example: a 6 × 4 m office ceiling
Twenty-four square metres with a 600 × 600 mm tile. The calculator returns 67 tiles, 7 main runners at 3.6 m, 34 cross tees at 1200 mm, 34 more at 600 mm, 7 lengths of wall angle at 3 m, and 20 hanger drops.
Each part comes from the grid rather than from a rule of thumb. Main runners go up every 1.2 m, so a 4 m width takes 4 runs; each run is 6 m long and comes in 3.6 m lengths, so that is 7 lengths. Wall angle is the perimeter — 20 m — divided by the 3 m it is sold in. Hangers are one every 1.2 m along each main.
The tile count uses the 0.36 m² module: 24 ÷ 0.36 is 66.7, rounded up to 67. Cross tees use a 0.72 m² cell, which is why there are 34 of each length rather than one number.
A 12 × 8 m office on a 1200 module
Ninety-six square metres with 600 × 1200 tiles: 134 tiles, 24 main runners, 134 cross tees at 1200 mm, 14 lengths of wall angle, 70 hangers — and ZERO cross tees at 600 mm. The results row says so in as many words: not used on a 600 x 1200 grid.
That is the whole point of the tile dropdown. A 1200 module is a different grid, not the same grid with longer tiles dropped into it. One of the two sets of cross tees simply stops existing, and if you had ordered from a 600 × 600 take-off you would have a pallet of 600 tees nobody can fit.
Everything else scales with the room rather than the tile: mains still run every 1.2 m, so eight metres of width is 7 runs, each 12 m long, which is 24 lengths at 3.6 m.
A corridor, and why long thin rooms cost more
A corridor 20 metres by 1.8 is 36 m² — nowhere near the office above. It takes 100 tiles, 12 mains, 50 cross tees of each length, 34 hangers, and 15 lengths of wall angle.
Fifteen. The 96 m² office needed 14. A corridor of a third the area needs MORE wall angle than the office, because wall angle follows the perimeter and a long thin room has a huge perimeter for its floor: 43.6 metres around 36 m², against 40 metres around 96.
It is the single thing most often underestimated on corridors, lobbies and any room that is more shape than space. Tiles scale with area; edge trim scales with the walls, and the two come apart badly once a room stops being square.
The mistake that costs the most
Assuming the tile size only changes the tile count. It does not. Switch from 600 × 600 to 600 × 1200 and the count roughly halves — but you also stop needing one of the two sets of cross tees, because a 1200 module is a different grid, not the same grid with bigger tiles in it.
That is why the drawing beside the form redraws itself when you change that dropdown. A diagram showing a square grid next to a 2 × 4 selection would be quietly asserting the two jobs are the same, and the components list would be the thing that proved otherwise at the wholesaler.
What to tell the supplier
Grid components are sold in fixed lengths, and this page has already converted to them: mains in 3.6 m, wall angle in 3 m, cross tees by the piece. Order in those units rather than in metres and there is nothing left to translate.
Say "tile" rather than "board" when you order. This page counts runners, cross tees, wall angle and hangers, which is a T-bar suspended grid. Ceiling board almost everywhere means plasterboard screwed to furring — no grid, no tees, and a completely different order.
Checking the answer without trusting us
The working gives the ceiling area, the perimeter, and the module and cell sizes it divided by. If your grid is set out differently — mains at other centres, or a border tile detail around the edge — those are the two lines to adjust from.
What this page deliberately does not give you is a load rating. Whether a grid will carry a light fitting, a speaker or an air diffuser depends on the manufacturer's own tested figures for that system, and inventing a number for it would be worse than not having one.
Suspended Ceiling Take-Off: Tiles, Tees and Wall Angle
What a drop ceiling is made of and how to count each part — mains at 1200 mm, cross tees per cell, wall angle round the perimeter, and what the module changes.
Hanging Lights From a Suspended Ceiling, Safely
A ceiling grid is designed to carry tiles and nothing else. Which fixtures need their own hangers back to the structure, and how sagging starts.
NRC vs CAC: Which Ceiling Tile Rating You Need
One rating measures noise inside the room, the other measures sound leaking to the room next door. Why a tile that is good at one is often poor at the other.